Tuesday, 15 April 2014
Sunday, 13 April 2014
Saturday, 12 April 2014
Nearly there, in what feels like a section producing factory.... 1:50 scale section for the 1:200 Design Development stage showing the paddling stream, which I could really see bringing people in to the park in the summer, and for good measure Mark Zuckerberg and his mates having lunch, which I don't feel is quite so much of a draw.
Friday, 11 April 2014
Decided to go for a big double width 1:50 Section for the 'Design Development' stage where we look at the site at 1:200. I am trying to convery all the landform and swales across the site which are such a big part of the design. I'm really hoping I can print this as one big piece of paper. Maybe put two other sections above or a line of sequentials. Keep getting disracted by the view I've created outside for myself in the front garden. Loving my stonking big Euphorbia mellifera with the Cornus MF new leaves right now. Trying to feel the love and getting very sick of photoshop. That's not going to be getting better any time soon!
Tuesday, 8 April 2014
Lots of work to do on my sketches. Just wireframes to work out what I should be looking at at the moment. Tricky in a way becasue my 1:50 site is essentially 2 paths and is almost all about people moving through the site on towards to parks main attractions elsewhere. Lots of work to do here on these too....
1:50 plan that was ready for yesterdays crit, only really had the base layer and annotation ready, with just a short time to try putting very realistic clone tool patches of the actual plants showing where they would be from above. Plus the water is a miserable effort. The sky it is reflecting looks like the boiling fumes of a volcanic erruption. The effec in the bottom right corner was all a bit much, and I ran out time to make the differing heights clearer. Feedback on previous plans was that they were too wishy washy, now too much. So back to the crit sheets and the list of doom we were given yesterday....
Subscribe to:
Posts (Atom)






